The symptom
I want a window that catches a breeze, but the old hinged sash hangs crooked and will not pull tight against the seal.
The proposed method
Ask the provider to identify the proposed opening direction, frame scope and operating hardware. Confirm how the sash will clear nearby fittings and how opening, closing and latch engagement will be checked. Have retained trim, perimeter finishing and any separate opening repairs listed alongside the selected window.
Items to discuss
casement or awning frame, hinged sash, operator, hinges, locking hardware, compression gasket, flashing. Clarify which parts or materials would be supplied, which tools would be used, and what documentation is included.
Property context in Orlando
The City of Orlando lists window and door replacements among the projects covered by its Building Permit Forms section. Use that section to find the current application resources, then confirm the property address and proposed replacement scope with the city. This link is a starting point for City of Orlando projects; it does not establish the requirements for an individual property or an address in a neighboring jurisdiction.
Source for planning your work ↗Orange County's storm-repair guidance states that window and exterior door replacements always require a permit, that mechanical repairs including air-conditioning replacement or major ductwork repairs need one, and that replacing broken glass in an existing frame without changing its size or type does not. It also warns that unlicensed contractors may try to take advantage of residents after a storm and that work done without a permit may not be covered by homeowners' insurance. Worth reading before arranging window and exterior door work on storm damage in Orlando, and worth telling the insurer about in advance.
Source for local exposure ↗Orange County's guidance for residential and commercial windows, doors and overhead doors asks for a completed county Product Approval Specification Sheet with the application, and states that the approved installation details must be on the jobsite for inspection — failure to do so results in a failed inspection. Ask which approved product is being quoted and whether the installation details for that product will be on site on the day.
Source for local context ↗Area-wide context is not a finding about your own property.
What shapes the quote?
The component being changed
Glass-only, hardware-only and complete-frame work involve different materials and labor. Compare proposals for the same work.
Access and concealed condition
Opening size, access, finishes and damage discovered during removal can change the work. Agree how any change will be documented.
The complete proposal
Clarify removal, disposal, weatherproofing, finish restoration and completion checks before comparing totals.
Ask for a written quote and confirm the complete charge before work begins.
Before the visit
A little preparation helps.
0 of 3 details ready
