The symptom
I want fresh air through the upper section while the lower section stays closed, with the option to operate both sections together.
The proposed method
Confirm the selected split-door assembly and how the upper and lower sections are intended to operate. Ask which connecting hardware, latches, shelf and seals are included and how the frame and threshold will be handled. Agree on finishing responsibilities and checks of the two sections operating separately and together.
Items to discuss
Dutch door leaves, prehung jamb, hinges, shelf, quadrant bolt, weather seals, threshold, lock hardware. Clarify which parts or materials would be supplied, which tools would be used, and what documentation is included.
Property context in Holden Parramore
The City of Orlando's permitting pages state that the State of Florida requires a permit for most projects, even small ones, and that a project valued above $5,000 needs a Notice of Commencement filed with the Orange County Comptroller before work starts. For window and exterior door work, ask which permit type the scope falls under before anything is ordered. Holden Parramore sits inside Orange County, and some addresses near the city line are unincorporated and permitted by the county instead — confirm which building department covers the address. This is the authority's published guidance, not a determination about a particular property.
Source for planning your work ↗Orange County's guidance for residential and commercial windows, doors and overhead doors asks for a completed county Product Approval Specification Sheet with the application, and states that the approved installation details must be on the jobsite for inspection — failure to do so results in a failed inspection. Ask which approved product is being quoted and whether the installation details for that product will be on site on the day.
Source for local context ↗Area-wide context is not a finding about your own property.
What shapes the quote?
The component being changed
Glass-only, hardware-only and complete-frame work involve different materials and labor. Compare proposals for the same work.
Access and concealed condition
Opening size, access, finishes and damage discovered during removal can change the work. Agree how any change will be documented.
The complete proposal
Clarify removal, disposal, weatherproofing, finish restoration and completion checks before comparing totals.
Ask for a written quote and confirm the complete charge before work begins.
Before the visit
A little preparation helps.
0 of 3 details ready
